Drill String
T3 Swivel
→ 

Construction Monitoring Module

> Pile hole coordinates
> Pile hole verticality
> Drilling/lifting speed
> Rotation speed
> Thrust/pull pressure
> All fluid pressures
> All fluid flow rates
> Slurry pressure at the drill bit
> Underground pressure
Construction Positioning Module
It enables the drilling rig to be deployed accurately, conveniently and quickly at the correct position without the continuous assistance of surveyors. Meanwhile, it facilitates the management and control of constructed piles, avoiding the risk of missing piles (leaving untreated areas) or reconstructing completed piles.

Main Machine
Cement Slurry Jetting Pressure: 60~70MPa, Flow Rate: 200~300L/min;
Water Jetting Pressure: 80~130MPa, Flow Rate: 100~250L/min;
Main Machine Lifting Force: 18~60t, Rotation Speed: 1~60rpm (Stepless Speed Regulation),
Maximum Lifting Speed: 10m/min (Stepless Speed Regulation Available).
C28

C40

Pump




