{"id":2087,"date":"2026-11-20T14:34:47","date_gmt":"2026-11-20T06:34:47","guid":{"rendered":"https:\/\/www.apiepiling.com\/?p=2087"},"modified":"2026-11-20T14:34:47","modified_gmt":"2026-11-20T06:34:47","slug":"trench-cutter-for-plastic-concrete-cut-off-wall-dam-seepage-control-project","status":"publish","type":"post","link":"https:\/\/www.apiepiling.com\/id\/trench-cutter-for-plastic-concrete-cut-off-wall-dam-seepage-control-project\/","title":{"rendered":"Trench Cutter for Plastic Concrete Cut-Off Wall \u2014 Dam Seepage Control Project"},"content":{"rendered":"<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Project Overview<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">An aging earth-fill dam required rehabilitation after piezometric monitoring showed increasing seepage through its foundation. The remediation design specified a plastic concrete cut-off wall \u2014 a flexible slurry wall that tolerates deformation \u2014 installed through the dam body and foundation alluvium to an impervious layer. The alignment crossed highly heterogeneous ground: compacted dam fill, river alluvium with cobbles and boulders up to 800 mm, and moderately weathered rock at depth. Excavation depth reached 55 m, with cut-off wall thicknesses of 0.8 m. This combination of depth, boulder content, and strict permeability requirements made the trench cutter the only method able to guarantee continuity and verticality of the wall over the full alignment length of 620 m.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Project data<\/b><\/strong><\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Item<\/b><\/strong><\/span><\/td>\n<td><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Detail<\/b><\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Project type<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Dam remediation \u2014 plastic concrete cut-off wall (slurry trench)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Location<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">River dam site, South Asia<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Cut-off wall length<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">620 m alignment<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Wall thickness<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">0.8 m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Max. excavation depth<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">55 m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Geology<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Dam fill, alluvium with cobbles and boulders (up to 800 mm), weathered rock<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Permeability requirement<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">k \u2264 1 \u00d7 10\u207b\u2076 cm\/s<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Equipment supplied<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">APIE TC-series trench cutter, desanding plant, slurry management system<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>The Challenge<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Conventional clamshell grabs had been used on adjacent sections and consistently struggled where boulder horizons were encountered: grab jaws bounced or skewed on oversized cobbles, panels stalled for days, and borehole logs could not capture boulder positions accurately enough for pre-drilling. The owner required guaranteed wall continuity to 55 m depth, verticality within 0.3% so that adjacent panels overlapped cleanly at all levels, and a permeability of 1 \u00d7 10\u207b\u2076 cm\/s across the finished wall. Key technical risks:<\/span><\/p>\n<ul>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Boulders and cobbles interrupting grab excavation and damaging tooling.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Trench stability in loose dam fill above the water table during slurry excavation.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Consistent panel overlap at depth to avoid seepage windows between panels.<\/span><\/li>\n<\/ul>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Our Solution: Trench Cutter Excavation with Slurry Support<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">APIE proposed a TC-series hydraulic trench cutter configuration with heavier cutter bodies and reinforced tool bits selected for boulder-rich ground. The counter-rotating wheels crush boulders progressively instead of displacing them, eliminating the stall risk of grab methods. Excavated spoil was pumped to a desanding plant, where separated slurry was reconditioned and returned to the trench, keeping bentonite consumption and disposal volumes low \u2014 an important cost and environmental advantage of slurry trench cutters on cut-off wall projects.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Equipment configuration for the cut-off wall<\/b><\/strong><\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Component<\/b><\/strong><\/span><\/td>\n<td><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Role<\/b><\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>APIE TC-series trench cutter<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Continuous milling of fill, boulders and weathered rock to 55 m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Weighted cutter body + downthrust control<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Positive penetration through cobble and boulder horizons<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Inclination monitoring system<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Real-time verticality readout, panel deviation \u2264 0.3%<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Two-stage desanding plant<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Slurry cleaning to sand content &lt; 4% before plastic concrete placement<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Slurry mixing and storage system<\/b><\/strong><\/span><\/td>\n<td width=\"50.0000%\"><span style=\"font-family: 'times new roman', times, serif;\">Bentonite slurry preparation, circulation and loss control<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Construction Process<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">The wall was executed in primary and secondary panels of 2.8 m cutting length. Plastic concrete, designed with a modulus consistent with the embankment, was tremie-placed as each panel reached design depth. Because the trench cutter mills the fresh plastic concrete of primary panels when forming secondary panels, panel joints are mechanically bonded rather than merely abutted \u2014 a fundamental quality benefit of cutter-excavated slurry walls for seepage control. Slurry levels were maintained above the groundwater table at all times, and ultrasonic monitoring confirmed panel geometry before every concrete pour.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Results<\/b><\/strong><\/span><\/h2>\n<ul>\n<li><span style=\"font-family: 'times new roman', times, serif;\">620 m of cut-off wall completed within the dry-season programme, with peak production of 60 m\u00b2 per shift through boulder zones.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">All panels measured within 0.3% verticality, ensuring full-depth overlap between primary and secondary panels.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Piezometric heads downstream of the dam dropped to design levels within one filling cycle; seepage flow reduced by more than 80%.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Grab stall events eliminated; total excavation cost per square metre undercut the grab + pre-drilling alternative.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Following acceptance, the owner qualified trench cutter excavation as the reference method for the remaining dam rehabilitation phases, and the contractor added a second APIE trench cutter for the follow-up phases of the dam safety programme.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Why Trench Cutter Technology for Cut-Off Walls<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">For slurry trench cut-off walls deeper than roughly 25 m, or in ground containing boulders, cobbles, or hard rock, the hydraulic trench cutter offers unmatched advantages over grabs: continuous rather than cyclic excavation, built-in verticality correction, mechanical panel joints, and the ability to mill virtually any ground condition. APIE supplies trench cutters for diaphragm walls, plastic concrete cut-off walls, barrette piles, and cutter soil mixing, configured to your geotechnical data.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Contact APIE Foundation Equipment (China) Limited<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Are you planning a diaphragm wall, cut-off wall, or barrette pile project that involves hard rock, boulders, or great depth? APIE Foundation Equipment (China) Limited supplies hydraulic trench cutters, diaphragm wall grabs, desanding plants, and complete foundation engineering equipment to contractors worldwide, together with technical support, spare parts, and operator training.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Send us your geotechnical profile, panel dimensions, and schedule, and our engineering team will recommend the most suitable trench cutter configuration and a competitive quotation within 24 hours.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Email: <\/b><\/strong>apie@apiepiling.com<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>WhatsApp: <\/b><\/strong>+86 189 2128 7030<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Project Overview An aging earth-fill dam required rehabilitation after piezometric monitoring showed increasing seepage through its foundation. The remediation design specified a plastic concrete cut-off wall \u2014 a flexible slurry wall that tolerates deformation \u2014 installed through the dam body and foundation alluvium to an impervious layer. The alignment crossed highly heterogeneous ground: compacted dam [&hellip;]<\/p>","protected":false},"author":4,"featured_media":2088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[190],"tags":[153,587,588,589,590,591],"class_list":["post-2087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-site","tag-trench-cutter","tag-cut-off-wall-trench-cutter","tag-slurry-trench-cutter","tag-plastic-concrete-cut-off-wall","tag-slurry-wall-equipment","tag-deep-soil-mixing-wall"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/posts\/2087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/comments?post=2087"}],"version-history":[{"count":0,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/posts\/2087\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/media\/2088"}],"wp:attachment":[{"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/media?parent=2087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/categories?post=2087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.apiepiling.com\/id\/wp-json\/wp\/v2\/tags?post=2087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}