{"id":1322,"date":"2025-06-12T10:49:26","date_gmt":"2025-06-12T02:49:26","guid":{"rendered":"https:\/\/www.apiepiling.com\/?p=1322"},"modified":"2025-06-12T10:49:26","modified_gmt":"2025-06-12T02:49:26","slug":"from-challenges-to-breakthroughs-how-kr150-drilling-rig-conquered-the-bank-protection-project-of-the-beijing-hangzhou-grand-canal","status":"publish","type":"post","link":"https:\/\/www.apiepiling.com\/fr\/des-defis-aux-percees-comment-la-foreuse-kr150-a-conquis-le-projet-de-protection-des-berges-du-grand-canal-de-beijing-hangzhou\/","title":{"rendered":"Des d\u00e9fis aux perc\u00e9es : comment la foreuse KR150 a conquis le projet de protection des berges du grand canal P\u00e9kin-Hangzhou"},"content":{"rendered":"<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">En raison de l'\u00e9rosion continue par l'eau et des changements g\u00e9ologiques, les pentes de certains tron\u00e7ons du grand canal Beijing-Hangzhou se sont effondr\u00e9es et rel\u00e2ch\u00e9es, mena\u00e7ant gravement la s\u00e9curit\u00e9 de la navigation. Le projet de protection des berges est devenu extr\u00eamement urgent. Cependant, le site de construction \u00e9troit et accident\u00e9, associ\u00e9 \u00e0 l'exigence d'une navigation ininterrompue pendant la construction, a rendu les \u00e9quipements conventionnels inad\u00e9quats. Se distinguant par ses performances exceptionnelles, la foreuse Tysim KR150 s'est charg\u00e9e de la t\u00e2che cruciale de renforcer les berges du canal.<\/span><\/div>\n<h2 class=\"header-OdWb_u auto-hide-last-sibling-br\"><span style=\"font-family: 'times new roman', times, serif; font-size: 14pt;\">I. Relever des d\u00e9fis complexes en mati\u00e8re de construction<\/span><\/h2>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">Le chantier \u00e9tait \u00e9troit et irr\u00e9gulier. Tirant parti des avantages de son syst\u00e8me de marche sur chenilles, l'engin de forage KR150 a man\u0153uvr\u00e9 dans les zones confin\u00e9es avec une direction pr\u00e9cise et un mouvement stable. Gr\u00e2ce \u00e0 sa conception \u00e0 faible pression au sol, elle a efficacement \u00e9vit\u00e9 de s'enfoncer sur les sols boueux, assurant un positionnement stable sur chaque site de travail.<\/span><\/div>\n<div><\/div>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">Le projet concernait une formation g\u00e9ologique complexe, alternant entre un sol sablonneux mou et des couches de roches dures et alt\u00e9r\u00e9es. Avec un couple puissant de 150 kN-m, l'engin de forage KR150 pouvait rapidement p\u00e9n\u00e9trer dans le sol sablonneux et percer les couches rocheuses. Son syst\u00e8me de contr\u00f4le intelligent surveillait les param\u00e8tres en temps r\u00e9el et \u00e9mettait des avertissements imm\u00e9diats en cas de changements g\u00e9ologiques. Par exemple, lors de la construction dans des sections de sol sablonneux, le syst\u00e8me a alert\u00e9 les op\u00e9rateurs des risques potentiels d'effondrement du trou. Ils ont rapidement r\u00e9duit la vitesse de forage et renforc\u00e9 le support de boue, pr\u00e9servant ainsi la qualit\u00e9 des pieux for\u00e9s et la s\u00e9curit\u00e9 de la construction.<\/span><\/div>\n<div><\/div>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">Pendant la construction, la foreuse KR150 a collabor\u00e9 de mani\u00e8re transparente avec l'\u00e9quipement de levage des cages d'acier et de coulage du b\u00e9ton. Une fois le forage termin\u00e9, tous les \u00e9quipements se sont coordonn\u00e9s sans probl\u00e8me, ce qui a permis de r\u00e9duire consid\u00e9rablement le temps de construction de chaque pieu for\u00e9.\u00a0<\/span><\/div>\n<h2 class=\"header-OdWb_u auto-hide-last-sibling-br\"><span style=\"font-family: 'times new roman', times, serif; font-size: 14pt;\">II. R\u00e9alisations remarquables mettant en \u00e9vidence les points forts<\/span><\/h2>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">Par rapport aux appareils de forage traditionnels, l'appareil de forage KR150 a permis d'augmenter l'efficacit\u00e9 de la construction de 30%, ce qui a permis de respecter le calendrier serr\u00e9 et de r\u00e9duire au minimum les perturbations de la navigation sur le canal. Ces r\u00e9sultats ont \u00e9t\u00e9 salu\u00e9s par la direction du projet et les autorit\u00e9s comp\u00e9tentes.<\/span><\/div>\n<div><\/div>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">En ce qui concerne la qualit\u00e9 des pieux for\u00e9s, l'\u00e9cart de verticalit\u00e9 a \u00e9t\u00e9 contr\u00f4l\u00e9 \u00e0 0,5%, l'erreur de diam\u00e8tre du trou \u00e9tait inf\u00e9rieure \u00e0 5 mm, et tous les pieux ont respect\u00e9 les normes d'int\u00e9grit\u00e9, s\u00e9curisant fermement les berges du canal.<\/span><\/div>\n<h2 class=\"header-OdWb_u auto-hide-last-sibling-br\"><span style=\"font-family: 'times new roman', times, serif; font-size: 14pt;\">III. Reconnaissance des clients et perspectives d'avenir<\/span><\/h2>\n<div class=\"auto-hide-last-sibling-br paragraph-Oc488D paragraph-element br-paragraph-space\"><span style=\"font-family: 'times new roman', times, serif;\">Le chef de projet s'est f\u00e9licit\u00e9 : \"L'appareil de forage KR150 a d\u00e9pass\u00e9 nos attentes. Elle a su concilier efficacit\u00e9 et qualit\u00e9 dans des conditions complexes. Pour des projets similaires \u00e0 l'avenir, l'\u00e9quipement Tysim sera notre premier choix !\" Le succ\u00e8s de ce projet confirme la formidable force de la foreuse Tysim KR150. \u00c0 l'avenir, Tysim Machinery continuera d'innover, s'engageant \u00e0 fournir des \u00e9quipements et des services de qualit\u00e9 sup\u00e9rieure pour les projets de construction dans le monde entier.<\/span><\/div>","protected":false},"excerpt":{"rendered":"<p>Due to continuous water erosion and geological changes, the slopes of certain sections of the Beijing-Hangzhou Grand Canal collapsed and loosened, posing a serious threat to shipping safety. The bank protection project became extremely urgent. However, the narrow and rugged construction site, coupled with the requirement of uninterrupted shipping during construction, rendered conventional equipment inadequate. [&hellip;]<\/p>","protected":false},"author":4,"featured_media":1323,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[190],"tags":[343,344,345,346,347,348,349,350],"acf":[],"_links":{"self":[{"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/posts\/1322"}],"collection":[{"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/comments?post=1322"}],"version-history":[{"count":0,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/posts\/1322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/media\/1323"}],"wp:attachment":[{"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/media?parent=1322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/categories?post=1322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.apiepiling.com\/fr\/wp-json\/wp\/v2\/tags?post=1322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}